Approve the updated savings and costs for the ENERGY STAR and Ecorated New Manufactured Home UES measures and approve the measure specification, savings, cost, life, and research strategy for the NEEM 2.0 New Manufactured Home UES measures, and keep the Category as Planning. Keep the Status as Active. Set the sunset date to February 2020. Keep the weighted electric heating system measure. Use a weighting of 25% heat pump, Remove the un-weighted heat pump and eFAF-specific measures. Update ventilation assumptions per Brady Peeks in-plant research. Check and update ASHP HSPF assumption (8.2 vs 7.7).