10:00am |
Revised Adequacy Assessment for 2015
|
10:45am |
Peer Review of Adequacy Methodology
- Summary of PSRI draft report (Fazio)
- Discussion of potential modifications to standard (Diffely/Fazio)
>> Simulation example >> CVaR example
|
12:00pm |
LUNCH - On your own |
1:00pm |
Modeling Issues
- Review of hourly hydro shaping logic (Shearer)
- Description of thermal cycling problem (Shearer)
- User interface update (Byrne)
|
1:45pm |
Data Issues
- Thermal data validation (Fazio/Dragoon/Adams)
- Update on wind data (Fazio/Dragoon)
|
2:15pm |
Work Plan (Fazio/Diffely)
- Moving toward a new standard and assessment
- Production Version of GENESYS by October?
|
2:30pm |
Options (if time permits): Status Report on Current Stuides (Fazio)
- Overgeneration vs. Installed Wind
- Wind Effective Load Carrying Capability Analysis
>> Wind Study
|
3:00pm |
Schedule Next Meeting / Adjourn |